Everyone in my household is flabbergasted that we’re already a week into May; like, where did April go and when did it actually happen? Needless to say, spring is in full swing around here! Lots of fun stuff, plenty of sunshine, and a reinvigorating of the soul as we cast our eyes towards the end of the school year.
Debrief: April’s #craftygoals:
- Riley Blake Designs Block Challenge Sew Along: GUYS. I am officially caught up! Fourteen blocks sewn up! Patting myself on the back here because it is rare indeed when I get that far behind on something and then am actually able to truly get caught back up again. I haven’t had a chance to do photoshoots on all the blocks yet, so I’ll have to come back and do another post for that.
- Fat Quarter Shop’s Sewcialites 3 Sew Along: Staying caught up on that! The Cherry Limeade quilt is coming along beautifully, and I’ve found some great internet friends via the Sewcialites Facebook group. It’s such a nice group of people who are cheering each other on and lavishing praise left and right on everyone. This might be a sew along I continue with for many years because I’m enjoying both the actual sew along and also its participants so much.
- Renaissance’s Chef Clothing Tailoring: She never approached me about it and it doesn’t seem to be bothering her that much, so I may not actually help with this after all.
- Rachel’s Prom Dress Tailoring: I had to install a lining because the bodice was made from see-through MESH, but I figured it out easily enough and did a good job. Minimal hemming, woo hoo! She looked gorgeous; I’m so thankful that she really loved big, poufy ballgowns and we were able to go crazy with the full skirts over the years. Also thankful that my formal dress-hemming days are OVER. (No, I will NOT be making their wedding dresses, making the prom dresses cured me of that dream.)
- Graduation Quilts: I have all but one signature for Renaissance’s quilt. I’ve marked the seamlines on all of the blanks for Rachel’s quilt and have handed out quite a few of them to former teachers. I also realized that I think the signature “top” should actually be a signature “backing” because both of the girls have said they think they’d prefer that. SOOOOOOO…I’m designing new tops for the quilts to match the vibes of the now-backs of the quilts. Because when I said I’d make them a quilt each, I really meant two quilts each but cleverly packaged as just one quilt. ::rolls eyes::
- Penguin Party Quilt: Quilt top completed! Yaaaayyyy!! And that is where it will remain for a few months as I shift my attention to Rachel’s graduation. Anti-climactic? Yes. But I told you that THIS IS THE YEAR I FINISH THIS QUILT.
- Smitten EPP Quilt: I did put some time in on it. Can you tell? Not really. Rachel started her own Smitten quilt in the last couple of weeks to deal with the boredom of the last weeks of senior year. Everything is wrapping up and she’s tired of wasting time on her phone, so she asked me for some pointers on fabric placement and the like and then employed the EPP skills she acquired when I taught it to her and all the other Activity Days girls in our Utah ward forever ago. She’s completed about five of the large blocks and two or three of the small blocks and they look pretty good. It’s been so much fun to hang out in the craft room together in the evenings as she cuts fabric for her next block; like a little pause between school days Rachel and adulthood Rachel. I’ll cherish these conversations forever. So much is changing on the horizon for her and it is running at us full-tilt.
- Jingle Bell Socks: They are done! They still need blocking and finishing, which probably won’t happen until the knitting bug hits again in autumn, but they are technically done.
- Rainbow Coin Strip Quilt: Not technically a goal last month, but I decided to start every sewing session with fifteen minutes of quilting/finishing and lo and behold, the Rainbow Coin Strip Quilt is officially quilted! I’ve also trimmed it and created the binding for it. I’m just as shocked as you are. It’s only taken six years.
May #craftygoals:
Time-Sensitive Things That Need Working on ASAP:
Graduation!: I’ve got some massive graduation party planning to do in the next month, so my craft progress may be extremely impacted, but it’s totally fine. I need to make graduation leis for Rachel and her friends, and all the random things that will make her graduation party extra nice. So many fun projects!
Riley Black Designs Block Challenge Sew Along: This ends this month! There are sixteen block and I’ve sewn fourteen of them! Woot woot! There are a handful of setting blocks and sashings to actually finish this thing, but we’re not going to focus on that too much. I’m trusting that the energy of finishing the last block will push me to keep going. Wouldn’t it be great if I just finished this whole quilt by the end of May? A girl can dream…because if it’s not finished by the end of May, it will languish due to graduation and the absolute insanity of our summer schedule. So yeah, I guess the goal is to finish this completely by the end of May.









Fat Quarter Shop Sewcialites 3 Sew Along: Almost halfway there! Block #12 comes out tomorrow! I am still just absolutely loving this sew along. I ordered my border, backing and binding fabrics last week. It’s going to be such a pretty quilt! It’s so different from what I normally do and it’s proving that deviating from your comfort zone can be a really, really good thing. With graduation coming up and some really crazy scheduling in the weeks right after graduation, it would be a good thing if I could actually finish both May’s and June’s blocks during May. I’ve mocked up the entire quilt already so I’d be working off my own guesses at how the scheduled blocks are going to go together, but who cares?





Graduation Quilts:
- Renaissance’s: I might be able to really get going on Ren’s here soon. Needing to also construct a new top is going to slow me down, obviously, but the quilt will be used a lot more as a result and I cannot stand it when people stuff a quilt in a closet, so here we are. It would be good if I could finish Ren’s quilt entirely.
- Rachel’s: It could start moving forward; I’ve received quite a few signed blocks back already. I’ve mocked up her quilt top design and she’s enthusiastically approved it, so the fabric for that was included in the Sewcialites order and will be here next week. It would be good if I could finish the top this month and add the borders to the blocks that have already been signed.
Things to Work on After the ASAP Projects:
Machine Stitching:
- Rainbow Coin Strip Quilt: It’d be good if I could get this finished for good! That fifteen minutes at the start of each sewing session accomplishes a lot! We’ll see…
- Sew Many Stars BOM Christmas Quilt: This is the next UFO to finish on 2026’s list. I highly doubt I’ll get through my other projects to the point where I’ll work on this, but I’m listing it as a possibility.
Hand Stitching:
English Paper Piecing: Smitten EPP Quilt: My Smitten quilt is permanently located in its rolling cart next to the couch in the TV Room, and I’ll pick it up here and there to work on, but with daylight lasting longer and life being busy I don’t know how much work will go into it during the month of May. Watching Rachel’s quilt come together makes me want to get my own quilt going again, though, so perhaps her enthusiasm will rub off on me?
Knitting: I need a new car knitting project. I could wind some cool yarn and just make some regular ol’ socks? Although, with warmer weather coming up I probably won’t accomplish much knitting in the next while. I do prefer to do embroidery or EPP in the warmer months.
Embroidery: Perhaps, given the knitting conundrum, I should figure out an embroidery car project? There’s a beehive embroidery kit that’s been languishing for some time. I could pop it into the car for the summer.
It’s a great time of year, full of all sorts of fun things! I hope your projects are going well, and if you’re too busy with other things at the moment, remember that it’s totally fine to take breaks because the yarn and the fabric will wait for you. Enjoy the sunshine, the celebrations, and the time with family and friends, if that’s what’s pulling you away.
Summary of May’s Crafty Goals:
- Graduation projects: Leis, party prep, etc.
- Riley Blake Designs Block Challenge: Finish up last blocks, maybe finish the entire thing?
- Fat Quarter Shop Sewcialites 3 Sew Along: Definitely finish May’s blocks, but try to get June’s blocks done ahead of time, too.
- Renaissance’s Graduation Quilt: Try to finish completely. Crazy goal.
- Rachel’s Graduation Quilt: Try to finish the new top and add borders to the already-signed blocks.
- Rainbow Coin Strip Quilt: Finish completely.


