Things are finally calming down around here; I feel like I can actually check in this week, which is AWESOME. I love me some good ol’ dog days of summer when we can just putter around the house!
Rachel’s Graduation Signature Quilt
I managed a few hours in the craft room this week, mostly due to the bad air quality provided by the wildfires in our region—many outdoor activities were cancelled on account of the smoke, so I spent my unexpectedly freed-up time working on Rachel’s graduation quilt.
I am happy to report that the signature blocks are complete and assembled together. I next need to attach two borders. However, the original plan for this quilt was that the signature blocks would be the front of the quilt and then I’d use a simple backing. But now I’m going to use the signature blocks as the backing of the quilt, so the outermost border will need the extra four inches on each side for the quilt backing, and because of that extra four inches, I do not have enough of the fabric I’m planning to use for that border. I’ll need to hunt some down, oh dearie me! I think I actually saw a bolt of the fabric in one of my local quilt shops a couple months back, so I guess another visit in order, and soon.
Once those borders are in place, or while I am waiting to secure more of the outer border fabric, I will start working on the new front of the quilt. I do have the fabric for that. I also ended up with too many signature blocks, so some will be worked into the design of the front of the quilt, too.
Husband Christmas Socks
More time went into knitting these this week as well, yay!
I made the mistake of using some waiting-in-the-car time to work on them with the windows down, and eek, I had a raging headache from the smoky air within ten minutes.
I’m so glad from the temporary reprieve from the smoke, but it looks like the air quality will go back to yucky in the next week. I’m all for finding silver linings in challenges, so I am thankful when I get some free time due to cancelled activities, but it feels wrong to be getting so much personal good out of so much widespread destruction. I would happily give up the extra time to sew if it meant we got a miracle storm of rain to squelch out all these horrible fires.
July was busy, too; mostly with driving people places and trying to adjust to the different activities that summer brings. Good weather makes it difficult to stay indoors as well.
Debrief: July’s #craftygoals:
Rachel’s Graduation Signature Quilt: There has been progress. All signature blocks have at least two of their four borders.
Husband Christmas Socks: Finished the first one! (It looks SO GOOD!) I’m only on the ribbing of the second one.
August #craftygoals:
Rachel’s Graduation Signature Quilt: I know myself. If I move off of this project before it’s done, it will languish. So I am not going to make goals for any other project, besides the Husband Christmas Socks, until this quilt is completely finished. Summer is a hard time to find crafty time, so I’m just hoping to get some work done on this; it was silly to think I’d finish it last month, but here we are.
Husband Christmas Socks: I’m just going to keep trying to find thirty minutes a day to work on them.
If I manage to finish Rachel’s graduation quilt, I’ve promised myself I can jump back into working on the Fat Quarter Shop Sewcialites 3 sew along. But not before.
Kind of a boring update, but there it is. Enjoy these last days of summer! Being in Washington State means we don’t start school until later than most, so we’ve still got a good month of summer vacation to enjoy, and I do mean to enjoy it as much as possible, preferably outdoors because the winters here are gray and wet and very indoor activity-oriented and I feel like I’m going to lose my mind by the time February rolls around. You have to balance that part of the year out with by using the summer months to engage in a frenzied amount of watching the sunrise while walking through the woods and eating dinner in the backyard until it gets too chilly to stay outside anymore. Doesn’t leave a lot of time for the craft room. How I manage to forget that every year is baffling. 😉
Welcome to Full-on Summer, otherwise known as July! Whew! You guys, the Brookes were very, very busy in the month of June; I’m so glad I didn’t make any actual crafty goals for the month because there simply wasn’t any time available for crafting.
Debrief: June 2026 #craftygoals:
Graduation: Rachel is officially graduated from high school! I love graduations so much; the only celebrations I love more are weddings and babies. These life milestones are so special, and I try hard to make sure that they feel extra special for the individuals involved. I made a cute artsy ribbon lei for her and music note lei for one of her friends in the band because I think she’s awesome, and we threw a big ol’ graduation party as well. So much work! But everything went well and the party was well attended, so I’m satisfied.
Summer Plans: Well…sadly, my husband’s mother passed away the day before Rachel’s graduation ceremony. June 2026 was all about graduation plans and funeral plans. Once graduation was done and dusted, I pivoted immediately into funeral trip preparation. I was also invited to sing at the funeral, so I spent the weeks leading up to it feverishly transcribing (finally) a song I’ve been working on for years and working with Renaissance to write a flute part so she could be a part of it, too. I’m happy to report that it went well. With all of that going on, it’s easy to understand why summer planning has not happened yet.
July 2026 #craftygoals:
Time-Sensitive Things That Need Working on ASAP:
Graduation Quilts: All the signature blocks have been collected, so it’s time to start piecing! It’d be really great to get Rachel’s quilt completely done this month, but it will probably take longer than that, much to the dismay of the many people in our circles who have become (in their own words) obsessively invested in the final outcome of her quilt. Hey, if peer pressure helps you move forward with positive, productive things, then put that peer pressure in the driver’s seat and let it motivate you to push towards the finish line! (Looking at this in a realistic light, I think there’s a good chance I can pull off getting both of the flimsies complete in July.)
I am not sure when I’m going to get to Renaissance’s graduation quilt, though. With the realization that I want to put the signatures on the back of the quilt, I now need to create an entirely new quilt for the front of the quilt. As luck would have it, I just purchased a pattern not too long ago to make for her “someday,” but it’s a bit involved. I might work on a “palate cleanser” project once I finish Rachel’s grad quilt and before I get going on Ren’s again. I want to finish Ren’s grad quilt before the end of this year, though, that is a definite goal.
Sewcialites 3 Sew Along: I knew June would be busy and I’d fall behind on this, so I’m not panicking, but it is a goal to get caught back up with my blocks in the upcoming month. It’s just NINE blocks, no big deal…ha ha ha. I guess I’ll shoot for three per week. Oh, man…
Things to Work on After the ASAP Projects:
Machine Stitching:
Rainbow Coin Strip Quilt: The binding is done and Emily even slept under it when she was here for Rachel’s graduation. The label is not done yet, and I got it into my head to make a complicated label, so I’m working on piecing the label during my self-imposed mandatory 15 minutes of “Finishing Time” at the start of every work session in the craft room. It’s possible to get this done this month and do a legit photoshoot and all, but I can also see this label taking longer than that. Hopefully it all gets finished this month.
Baby Quilt: A friend is pregnant! There’s a baby on the way! Yay for babies!!! I’m trying to decide on the direction I want to go with this—I have a flimsy already made, the “Best Friends Farm Wonky Stars” quilt from during my Blank Quilting ambassador days, that would work beautifully, but I feel guilty re-purposing something I already made? That guilt is silly, right? If I decide to go with the partially-made quilt, I’d like to have it basted by the end of the month. If I decide to make a new quilt from scratch, I will need to decide on my pattern and acquire the fabric by the end of the month. As I write my options down and look out upon the expanse of projects waiting for my schedule to open up so I can work on them, I’m leaning heavily towards using the already-existing flimsy.
Hand Stitching:
English Paper Piecing: Get as much work done as possible on Smitten. It’s HOT in the craft room in the summer, so hand-piecing is perfect for this weather. I should set a daily stitching time goal for this. Fifteen to thirty minutes a day or something. We’re in the slog of it; I just need to sit my butt in the chair and stitch and it’ll be over faster.
Knitting: I usually work on the Husband Christmas Socks in secret, but I am much further behind on them this year than I normally am, so I’m going to talk about them because publicly shaming myself works for me. I try to have the Husband Christmas Socks done by the Fourth of July so they don’t hang over me, but here we are, almost at the Fourth of July, and I’m only about two-thirds done with the FIRST sock. Eek! The situation isn’t dire, obviously, but some heat needs to be applied. I’ve been working on them for fifteen minutes a day for some months now, but I guess I need to bump it up to thirty minutes until they’re done. It’d be great to finish them up by the end of the month, but a practical goal would be finish the first sock and get to the heel of the second sock? That’s actually a little ambitious, but possibly doable. I have some other socks I’d like to knit up as gifts this year, so being behind on this is annoying to my Christmas junkie senses.
Embroidery: None for this month. But it is July and hand stitching is lovely in the summer, so hopefully I get through my projects so I can visit some embroidery projects. There’s nothing like sipping lemonade and embroidering in the garden while the bees buzz in the lavender plants.
Summary of July’s Crafty Goals:
Rachel’s Graduation Quilt: Finish both the signature back flimsy AND the pencil crayon top flimsy.
FQS Sewcialites 3: Sew up blocks #15-23. (3 per week.)
Rainbow Coin Strip Quilt: Finish the label, photoshoot, blog post.
Riley Blake Designs’ Block Challenge Quilt: Sew up six chevron blocks.
Wonky Stars Baby Quilt: Baste. (Do I need to secure a backing and batting?)
Smitten EPP Quilt: 30 minutes of stitching a day.
Husband Christmas Socks: 30 minutes of stitching a day.
Embroidery: Indulge in some summer garden stitching on Sunday afternoons and soak in the aesthetic.