A red, white, and blue sawtooth star quilt block with farm animal fabric squares

Crafty Goals: July 2026

Welcome to Full-on Summer, otherwise known as July! Whew! You guys, the Brookes were very, very busy in the month of June; I’m so glad I didn’t make any actual crafty goals for the month because there simply wasn’t any time available for crafting.

Debrief: June 2026 #craftygoals:

Music and artist ribbon graduation leis in maroon, gold, and white.

Graduation: Rachel is officially graduated from high school! I love graduations so much; the only celebrations I love more are weddings and babies. These life milestones are so special, and I try hard to make sure that they feel extra special for the individuals involved. I made a cute artsy ribbon lei for her and music note lei for one of her friends in the band because I think she’s awesome, and we threw a big ol’ graduation party as well. So much work! But everything went well and the party was well attended, so I’m satisfied.

Rainbow paint chips board with bags of chips attached

Summer Plans: Well…sadly, my husband’s mother passed away the day before Rachel’s graduation ceremony. June 2026 was all about graduation plans and funeral plans. Once graduation was done and dusted, I pivoted immediately into funeral trip preparation. I was also invited to sing at the funeral, so I spent the weeks leading up to it feverishly transcribing (finally) a song I’ve been working on for years and working with Renaissance to write a flute part so she could be a part of it, too. I’m happy to report that it went well. With all of that going on, it’s easy to understand why summer planning has not happened yet.  

Family dressed in black at an LDS funeral.

July 2026 #craftygoals:

Time-Sensitive Things That Need Working on ASAP:

Graduation Quilts: All the signature blocks have been collected, so it’s time to start piecing! It’d be really great to get Rachel’s quilt completely done this month, but it will probably take longer than that, much to the dismay of the many people in our circles who have become (in their own words) obsessively invested in the final outcome of her quilt. Hey, if peer pressure helps you move forward with positive, productive things, then put that peer pressure in the driver’s seat and let it motivate you to push towards the finish line! (Looking at this in a realistic light, I think there’s a good chance I can pull off getting both of the flimsies complete in July.)

I am not sure when I’m going to get to Renaissance’s graduation quilt, though. With the realization that I want to put the signatures on the back of the quilt, I now need to create an entirely new quilt for the front of the quilt. As luck would have it, I just purchased a pattern not too long ago to make for her “someday,” but it’s a bit involved. I might work on a “palate cleanser” project once I finish Rachel’s grad quilt and before I get going on Ren’s again. I want to finish Ren’s grad quilt before the end of this year, though, that is a definite goal.

Sewcialites 3 Sew Along: I knew June would be busy and I’d fall behind on this, so I’m not panicking, but it is a goal to get caught back up with my blocks in the upcoming month. It’s just NINE blocks, no big deal…ha ha ha. I guess I’ll shoot for three per week. Oh, man…

Things to Work on After the ASAP Projects:

Machine Stitching:

  • Rainbow Coin Strip Quilt: The binding is done and Emily even slept under it when she was here for Rachel’s graduation. The label is not done yet, and I got it into my head to make a complicated label, so I’m working on piecing the label during my self-imposed mandatory 15 minutes of “Finishing Time” at the start of every work session in the craft room. It’s possible to get this done this month and do a legit photoshoot and all, but I can also see this label taking longer than that. Hopefully it all gets finished this month.
  • Riley Blake Designs’ Block Challenge Quilt: There’s so much on my plate this month, so I’m going to shoot for getting six of the chevron blocks done.
  • Baby Quilt: A friend is pregnant! There’s a baby on the way! Yay for babies!!! I’m trying to decide on the direction I want to go with this—I have a flimsy already made, the “Best Friends Farm Wonky Stars” quilt from during my Blank Quilting ambassador days, that would work beautifully, but I feel guilty re-purposing something I already made? That guilt is silly, right? If I decide to go with the partially-made quilt, I’d like to have it basted by the end of the month. If I decide to make a new quilt from scratch, I will need to decide on my pattern and acquire the fabric by the end of the month. As I write my options down and look out upon the expanse of projects waiting for my schedule to open up so I can work on them, I’m leaning heavily towards using the already-existing flimsy.

Hand Stitching:

English Paper Piecing: Get as much work done as possible on Smitten. It’s HOT in the craft room in the summer, so hand-piecing is perfect for this weather. I should set a daily stitching time goal for this. Fifteen to thirty minutes a day or something. We’re in the slog of it; I just need to sit my butt in the chair and stitch and it’ll be over faster.

Knitting: I usually work on the Husband Christmas Socks in secret, but I am much further behind on them this year than I normally am, so I’m going to talk about them because publicly shaming myself works for me. I try to have the Husband Christmas Socks done by the Fourth of July so they don’t hang over me, but here we are, almost at the Fourth of July, and I’m only about two-thirds done with the FIRST sock. Eek! The situation isn’t dire, obviously, but some heat needs to be applied. I’ve been working on them for fifteen minutes a day for some months now, but I guess I need to bump it up to thirty minutes until they’re done. It’d be great to finish them up by the end of the month, but a practical goal would be finish the first sock and get to the heel of the second sock? That’s actually a little ambitious, but possibly doable. I have some other socks I’d like to knit up as gifts this year, so being behind on this is annoying to my Christmas junkie senses.

Embroidery: None for this month. But it is July and hand stitching is lovely in the summer, so hopefully I get through my projects so I can visit some embroidery projects. There’s nothing like sipping lemonade and embroidering in the garden while the bees buzz in the lavender plants.

Summary of July’s Crafty Goals:

  • Rachel’s Graduation Quilt: Finish both the signature back flimsy AND the pencil crayon top flimsy.
  • FQS Sewcialites 3: Sew up blocks #15-23. (3 per week.)
  • Rainbow Coin Strip Quilt: Finish the label, photoshoot, blog post.
  • Riley Blake Designs’ Block Challenge Quilt: Sew up six chevron blocks.
  • Wonky Stars Baby Quilt: Baste. (Do I need to secure a backing and batting?)
  • Smitten EPP Quilt: 30 minutes of stitching a day.
  • Husband Christmas Socks: 30 minutes of stitching a day.
  • Embroidery: Indulge in some summer garden stitching on Sunday afternoons and soak in the aesthetic.

Wednesday, Week #1 of Covid-19 School Closure

img_20200318_085431

 

The kids gathered around the dining room table for their first formal day of “online learning” this morning.  The girls were left to their own devices (and I only had to reprimand one of them during the course of the day for goofing off before they were done with their schoolwork) and I had Nathaniel work on his stuff in my craft room so I could keep an eye on him, which was needed a few times.

img_20200318_085935

 

00100sportrait_00100_burst20200318095105345_coverBecause I was waiting to see if I’d get a package from Jaftex today, I didn’t want to start cutting out a dress or anything big, so I whipped up a couple of hair scarves from a pattern I bought when I went to Sew Expo a couple of weeks ago.  (And I have no idea why my hair looks so short in that photo, but it’s definitely making me think that a chop-off would look super cute!)

The kids were all pretty much done with their work by the time the “school bus lunch” alarm went off at 10:35am.  Our district is making sure all the kids eat during this break by delivering breakfasts and lunches via the bus routes, so we headed over to the bus stop and the kids were happy to say hi to their bus driver when she came ’round.

While we were waiting for the lunches to arrive, the FedEx truck rolled on up to my house and I had to wait a whole ten minutes before the bus came and I was able to retrieve my package from the front porch!  The agony!

 

Because, yep, that package contained fabric.  Adorable farm animal fabric that will work spectacularly well for a baby gift for a friend and her impending arrival:

90396036_10158086198001670_6983628338103320576_o

So. cute.  I love those little sheep, and that green print that just begs for some fussy cutting.  I think I’ve settled on a pattern, which won’t be as involved as I would like; but, I wasn’t planning on making a quilt in the next six weeks, so it’s got to be a bit of a quick sew so I can still fit in all my spring clothing sewing.  Whew!  Busy hands leave little time for wandering thoughts, so I’m thankful for the plethora of projects at this anxiety-provoking time!  It’s going to be a cute little quilt.  Plus, this collection–“Best Friends Farm”–has both a quilt panel and a soft book panel to sew up, too.  Lots of cute little projects to share with you over the next little while!

img_20200318_155909

Well, good night, dear readers.  I hope this is a peaceful time for you; a time to reconnect with family and a time to spend in a little bit of self-reflection.

And if it can’t be that, then I wish you wonderful success with whatever it is you choose to use to diffuse your stress.  Lucky me, I’ve got a kid who stress bakes, and she made some absolutely delicious soft pretzels this afternoon.  I wish you the kind of happiness that comes from eating a soft pretzel on a sunny day with your family.  Whatever that is for you, I hope it’s happening.  Stay healthy and safe!