I am so tired of reporting that I was sick and it affected my ability to move forward on my crafty goals each month, but alas, such is what I need to report. Yet again. Ugh. February kicked my butt, but that’s pretty normal for this time of year EVERY SINGLE YEAR, so I’m not too terribly upset about it, just annoyed. I caught that nasty flu that was going around and that took me out for two weeks. And then, because I was lying around for two weeks, my back spasmed once I got back on my feet and I was down and out with that flare-up for ten days. I finally got to moving around somewhat normally, enjoyed a couple days of productivity, and then BAM(!) migraine for two days. Then another migraine for six days that require an ER visit to shut down. ARRRRGHHHH. So, y’know, basically four weeks of no real progress on anything. I remain optimistic that my luck will trend upwards in March. Always optimistic…
Debrief: February #craftygoals:
- Rainbow Coin Strip Quilt: Can’t quilt when you’re sick. Sigh.
- Secret Project: I’ve made a lot of progress on this, but it’s not ready to unveil.
- Penguin Party Quilt: Did make progress here and there.
- Rachel’s Graduation Signature Quilt: I’ve gotten a few of the blocks signed, and am in the process of getting the blank blocks sent out to various people. I am killing this.
- RBD Block Challenge: I am almost done with Block #1. Let’s just ignore the fact that SIX of the blocks have been published. Progress is progress.
- FQS Sewcialites 3 Sew Along: I am done with the first block! Yay me! I’ll get to working on the second block this weekend. I haven’t photographed it yet, sorry.
- Jingle Bell Socks: Coming along nicely in the stolen moments.
March 2026 #craftygoals:
Time-Sensitive Things That Need Working on ASAP:
Guild Show & Tell Quilt: I’d still like to finish the Rainbow Coin Strip Quilt to show, and I’ve got the Sew Many Stars BOM Christmas Quilt on my list for March. I’m so far behind, so I have only the faintest glimmer of hope to get both of these done, but hope I will!
Secret Project: I had to push it back a couple of weeks due to the illness and injury, plus I grossly underestimated how much behind-the-scenes learning I was going to have to do to pull this off, but it should be ready to unveil sometime in March. So excited!
Things to Work on After the ASAP Projects:
Machine Stitching:
- Penguin Party Quilt: I’m going to commit: I want to finish the top for this THIS MONTH.
- Easter Say-It Sew Along Banner: Easter is April 5 this year so I want to sew this up in March so everything is ready for the big day.
- Renaissance Graduation Quilt: Hoping to make more progress on this. I’m still waiting on some signatures, so I’m doing the best I can.
- Rachel’s Graduation Quilt: I don’t know if I’ll get to touching this, but it’d be great if I could get some signatures back so I can start assembling the blocks. It’s largely dependent on others’ efforts/timeliness, so I’m keeping my hopes low so I don’t feel disappointed if nothing happens this month.
Hand Stitching:
English Paper Piecing: It’d be good to get work done on Smitten. It’s a weird time of year, whatwith the weather changes and garden needing more attention, so I have no idea how this will shake out.
Knitting: It’d be great if I could finish the Jingle Bell Socks.
Embroidery: I don’t have anything in the works for March.
There’s a lot of stuff to get caught up on in regular life before I can really get into the craft room, so this might be a low achievement month. However, sometimes things come together easy and then I get to do lots of crafty stuff, so we’ll see. Gardening needs to start happening too…it’s that time of year! So much fresh goodness coming our way with more light and sunshine as well. We made it through the darkest part of year, friends! Good job! Enjoy the upcoming spring!
Sorry there’s no pictures to go with this post, but if I take time to do pics, it takes up time to craft. I’m going to get caught up eventually and then it’ll be Picture City ’round these parts!
